Jump to content

Welcome to RennTech.org Community, Guest

There are many great features available to you once you register at RennTech.org
You are free to view posts here, but you must log in to reply to existing posts, or to start your own new topic. Like most online communities, there are costs involved to maintain a site like this - so we encourage our members to donate. All donations go to the costs operating and maintaining this site. We prefer that guests take part in our community and we offer a lot in return to those willing to join our corner of the Porsche world. This site is 99 percent member supported (less than 1 percent comes from advertising) - so please consider an annual donation to keep this site running.

Here are some of the features available - once you register at RennTech.org

  • View Classified Ads
  • DIY Tutorials
  • Porsche TSB Listings (limited)
  • VIN Decoder
  • Special Offers
  • OBD II P-Codes
  • Paint Codes
  • Registry
  • Videos System
  • View Reviews
  • and get rid of this welcome message

It takes just a few minutes to register, and it's FREE

Contributing Members also get these additional benefits:
(you become a Contributing Member by donating money to the operation of this site)

  • No ads - advertisements are removed
  • Access the Contributors Only Forum
  • Contributing Members Only Downloads
  • Send attachments with PMs
  • All image/file storage limits are substantially increased for all Contributing Members
  • Option Codes Lookup
  • VIN Option Lookups (limited)

Recommended Posts

I have received the telephone module kit for option p666 and am having it installed next week. But, I want to know the labor allocation for the install. I would download the TSB myself and look at the last page for the amount, but this TSB is not available on the renntech site for some reason. I have a copy of the TSB, but I am missing the last page that has the total TU for install. Can someone please forward a TSB to me or post the last page online? The TSB I have says 911(997) 2/05 9155

Telephone Module (Option P666).

Thanks

Also how does a TU translate into hours? is 120 TUs, 2 hours or 1.2 hours?

Edited by AnthonySp
Link to comment
Share on other sites

Last page:

Labor Operation 91 55 23 00

Description:

Telephone Module installed

Includes: Installing antenna, microphone, telephone module,

and corresponding wires, coding control units, reading out fault memory, and erasing if necessary. Performing a function test.

Time Units

460 TU

(4.6 hrs)

100TU= 1 hr

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.